Home/Services/Due Diligence
Specialty ยท Pre-Purchase Technical Review

Decide if the site works before earnest goes hard.

Most preventable losses on a real estate deal are decided at closing — when a constraint that an engineer could have flagged in a few hours becomes a six-figure entitlement problem post-acquisition. Avidan surfaces those constraints before the deposit goes non-refundable.

$400KLargest Single-Deal Save
5-10Business Day Turnaround
67FL Counties Mapped
100%Written Decision Memo
What's included

A full early-stage technical review.

Six investigation tracks. One coordinated decision document. No slide deck.

Site & zoning

Current zoning, overlays, height/density/setback constraints, allowed uses, conditional-use options, comp-plan future-land-use, and pending land-use changes within walking distance.

Code constraints

Florida Building Code (FBC 2023), accessibility (FBC Accessibility), energy (FBC Energy Conservation), wind (ASCE 7-22), and any specialty-occupancy code requirements affecting the project.

Environmental flags

FEMA flood-zone classification, NWI wetlands, FDEP-flagged contamination concerns, conservation overlays, and recommendations on whether ASTM E1527-21 Phase I ESA is warranted.

Utilities & infrastructure

Water, sanitary sewer, stormwater, electric, gas, and access road status. Capacity, connection-fee realism, and impact-fee exposure under the local mobility / capacity ordinances.

Entitlement path

Realistic timeline and cost for any required rezone, special-use, variance, comp-plan amendment, PD/PUD, or DRI process. Risk-rated against current jurisdictional patterns.

Written technical opinion

Direct go / fix / no-go recommendation. Constraints listed in priority order with code citations. Single decision document, not a slide deck. Sized for an LP memo or IC.

Deliverables & timeline

What lands in your inbox.

Standard turnaround is 5-10 business days from receiving the property data. Rush turnaround available when a contract clock is running.

  • Decision memo (PDF) — 8-15 pages, code citations, prioritized risks, recommendation
  • Constraints map — zoning + flood + wetlands + setbacks layered on parcel
  • Entitlement-path matrix — rezone / variance / admin pathways with timeline + cost ranges
  • Impact-fee & connection-fee estimate — documented with current ordinance refs
  • Recommended next steps — if go, what to confirm; if no-go, what could change it
  • One follow-up call to walk the buyer / IC through the findings
When to engage

Before the deposit goes non-refundable.

The best time for due diligence is the moment a site looks interesting and before any non-refundable money is on the table.

01

Pre-LOI

Quick desktop screen before submitting an offer. Surfaces deal-breakers in 24-48 hours so the LOI either goes out clean or doesn't get sent.

02

Inside the diligence window

Full technical workup during the contractual due-diligence period. Outcome supports a price renegotiation, contingency removal, or termination.

03

Pre-closing extension

Already past initial diligence and need a second look before extending? We pressure-test what the seller's package said and what your team has confirmed.

Buyers we typically support

Who this work is built for.

Investors

Land & development investors

Owner / GP / sponsor evaluating a site before committing equity or hard deposit.

Family Offices

Family offices & HNW

Independent technical layer on top of broker materials and seller diligence packages.

Lenders

Lenders & equity partners

Pre-funding technical review supporting underwriting or LP investment-committee memos.

Brokers

Brokers & advisors

Site-fit screen before pitching a parcel to a specific buyer profile or use case.

Send us the parcel ID, address, or LOI — we'll tell you what we'd want to look at first.

Evaluate a Property Decision memo in 5-10 business days
Project Review

Bring the site, scope, or permit issue first. Then build the right path.

Avidan supports owners, developers, investors, and project teams that need a clearer technical decision before design drift, permit delays, or expensive rework start compounding.

Feasibility firstFaster permit coordinationOne integrated technical team
Start Project Review Email us
Best for projects in evaluation, pre-design, permitting, redesign, or technical rescue.